Skip to content
Center for Advanced Self-Powered Systems of Integrated Sensors and Technologies (ASSIST)
Toggle navigation
Home
About Us
Vision & Mission
People
Partnerships
Contact/Visit
IConS
ASSIST Facilities
Research
Cutting-Edge Technologies
Energy Harvesting and Storage
Low Power Sensors
Low Power Electronics
Smart Textiles
Engineered Systems
2024 Research Portfolio
Industry
ASSIST Industry Ecosystem
Industry Members
Industry Member Login
Workforce Development
Academic Programs
Undergraduate Academic Program
Graduate Program
Pre-College Outreach Program
ASSIST 2024 Day Camps
K-12 Outreach
Wearable Device Challenge
News + Events
2025 ASSIST & IConS Industry Meeting
ASSIST & IConS Speaker Series
ERC-Wide Workshop Report
Recent Posts
Recent ASSIST Publications and Media Mentions
Student/Faculty Login
Salary Distribution Change
Search
Search for:
Search
Salary Distribution Change
Salary Distribution Change Form
SDC / 90 Day Retro Action
"
*
" indicates required fields
Complete all fields as applicable:
Enter Your Email
Effective Date
*
Payroll Schedules
MM slash DD slash YYYY
Is a 90 Day Retro Action Needed?
*
Yes
No
Additional Comp? (If applicable)
Summer Salary move or other compensation?
Work Against Position?
Work against is normally used on Distribution Setup if the employee’s salary is funded partially by the position or the employee’s distribution is to be different than the position for a certain period of time and the position is to retain its “base” funding.
Yes
No
Employee Information
Name
Last
*
First
*
Employee ID
*
Job Title:
*
Annual Base Salary / Hourly Rate
*
FTE
*
Full time = 1.0 FTE, Half time= 0.5 FTE
Salary Supplement (if applicable)
Funding Information:
Funding total must equal 100%; if project is funded by a different department/unit or College/Division, please make sure to receive prior approval. Changes on non ledger 5 accounts are subject for additional approval by the college before entry/submission. Accounts: 51119 (GRA), 51119 (Post Doc), 51450 (Student worker STW), 51410 (Non STW)
Current Distribution Setup
*
Project #
Phase (If Applicable)
Account Code (Refer above)
Dollar Amount or %
Add
Remove
Requested Distribution Setup
*
Project #
Phase (If Applicable)
Account Code
Dollar Amount or %
Add
Remove
90 Day Retro Action Request
For requests over 90 days, upload your completed form below. Download
Ninety Day Retro Action Form
Attached Submission
Max. file size: 64 MB.
Comments: